Abadan desalination plant

Abadan is 123 kilometers away from Ahvaz (the provincial capital of Khuzestan) and located in Khuzestan province along Arvand. Due to the high population of the city and the water shortage in the region, Sazeh sazan Company began to build the Abadan desalination plant in cooperation with the ministry of Power and Khuzestan Water and Sewage Company. Thus, the facility began to serve the locals.

Features of Abadan desalination Project:

Type of contract B.O.O
Year of operation 2008
Type of desalination system Reverse Osmosis (RO)
Production capacity 15,000 cubic meters per day
Duration of contract 7 years